1. Future lake site. 2. Future dam site. 3. Clearing water line.
Pictures 4 -6 Clearing continues.
Pictures 7 -9 Stripping topsoil from inside lake.
10. Borrow area to be cleared. 11. Borrow area cleared. 12. Stripping topsoil from
borrow area.
13.Excavation of keyway. 14. Adding water for compaction. 15. Dam and liner rise
together.
Pictures 16 -18 Shows the dam and liner continuing to rise.
Pictures 19 - 21 Shows the dam and liner as they reach desired elevation.
22. Spillway excavation 23. Felt placed in bottom of 24. Rock for spillway.
spillway, to help prevent erosion.
25. Placing rock. 26. Rocks have been placed. 27. Setting box culverts
for driveway.
28. Box culverts set. 29. Dirt placed over culverts. 30. Time to reclaim the
borrow area.
31. - 33. Shows the borrow area being graded back.
34. - 35. Borrow area nears completion. 36. Borrow area restored.
37. Back side of dam finished. 38. - 39. The lake full with fountain.